Skip to content
  You are not logged in Log in
You are here: Home » Library » Sentinels research program text » node45.html
A A A
Search site
Please enter your search text:
Contact info
Sentinels Program Office, Technology Foundation STW (details).

node45.html

Time line

next up previous contents
Next: Time line projects Up: sentinels-030827 Previous: SENTINELS-II   Contents


Time line

Figure 8.1: The time line as expected at the time of writing. The dashed box encloses SENTINELS(-I) (as described in this document), the dotted box SENTINELS-II (the possible follow up program, see section 7.7).
\begin{figure}\begin{center}
\hspace*{-2cm}%%
\epsfig{file=Timeline-030612.eps, width=20cm}
\end{center}
\end{figure}

The SENTINELS research program intends to start in the second half of 2003, but details are to be determined. The time line as expected at the time of writing is shown in figure 8.1. It should be seen as an indication. The scale is in years and quarters. The start of the program is in year 1.

Please note that this figure has two main parts: the dashed box which encloses SENTINELS-I (or, for short, SENTINELS, as described in this document), and the dotted box SENTINELS-II, the possible follow up program (section 7.7).

The events of SENTINELS-II are only shown to indicate that the mid-term review of SENTINELS-I determines the contents of SENTINELS-II. We have shown (with approximate dates) the steps ``composition of the SENTINELS-II proposal'', ``approval term for SENTINELS-II'', and ``consideration term SENTINELS-II round 1...''.



Subsections


next up previous contents
Next: Time line projects Up: sentinels-030827 Previous: SENTINELS-II   Contents